ICT Projects

Our Work

ICT Projects

Vertiv Parklands
EPCR80 Million

Vertiv Parklands

ISF ICT Infrastructure was appointed by Vertiv to deliver a high-quality prefabricated modular Tier III compliant data center system for a client's facility. The solution consists of 120 racks with expansion to up to 486 racks and built around industry-leading Vertiv power and thermal management technologies, as well as advanced Lithium Ion batteries for reduced operational expenses.

Open Connect Malawi Data Centre
EPCR140 Million

Open Connect Malawi Data Centre

ISF was appointed as the EPC Contractor to build a prefabricated data center (Power Module + SmartMod MAX). The data centre consists of 1 x Power Module 400kW and 2 x SmartMod MAX modules with 78kW of IT load each. Deployment – Lilongwe Malawi.

MTN ACE Landing Station
Main ContractorR87 Million

MTN ACE Landing Station

ISF Construction appointed to construct the onshore landing station and all critical systems located at Melkbostrand in the Western Cape. Africa Coast to Europe (ACE) is an optical-fibre submarine cable system serving 24 countries on the west coast of Africa and Europe.

ADC Data Centre Commissioning
Independent Commissioning AgentR600 Million

ADC Data Centre Commissioning

ISF provided Independent Commissioning Agent services in line with Microsoft requirements for the design oversight and Level 4 to 5 commissioning for the AZTEC Data Centres in Midrand and Cape Town.

Mascom Botswana Technical Centre and Offices Upgrades
Development ManagersR168 Million

Mascom Botswana Technical Centre and Offices Upgrades

ISF was appointed to develop a new Technical Centre and offices to address recent and future GSM traffic requirements. Construction involved: 806.6m² of usable conditioned Technical Centre area, 1788m² of Office Area, 532m² of Energy Centre, 54 meter Transmission Hub Lattice Tower.

Botswana Innovation Hub – Government Integrated Data Centre
Project Management364 Million BWP

Botswana Innovation Hub – Government Integrated Data Centre

Design and build a Tier IV Data Centre certified by Uptime Institute. Stages 1 to 3 of project management.